Project: Electrical Maintenance and Standby Execution — Barabati Stadium, ODI Match 2024 (India vs. England)
Client: OCA
Scope of Work
Performed comprehensive electrical maintenance and standby electrical execution for the Barabati Stadium during the India vs. England ODI match in 2024.
Conducted pre-event inspection and testing of all stadium electrical systems, including main distribution panels, backup generators, transformers, switchgear, lighting circuits, and emergency power systems.
Implemented preventive maintenance measures to ensure reliable power distribution and minimize the risk of outages during the event.
Provided full-time standby electrical support throughout match day, with on-site electrical technicians and engineers ready to respond to any faults or power interruptions.
Managed load balancing and coordinated with stadium operations to prioritize critical systems (broadcasting, floodlights, public address, security systems, player amenities, and concession utilities).
Performed rapid troubleshooting and fault isolation for any electrical anomalies detected during the event.
Carried out safe switching operations and synchronization for standby generators and paralleling equipment as required.
Ensured compliance with all relevant safety protocols and client-specified procedures, including lockout/tagout, PPE use, and coordinated communication with OCA representatives.
Key Deliverables
Pre-event electrical inspection report with identified issues and corrective actions carried out.
On-site standby electrical team roster and shift schedule for event coverage.
Real-time incident log documenting any faults, remedial actions taken, and time-to-restoration metrics.