Utility Shifting Works for NH-5A Highway Expansion Project

Project Overview

ELLEXO TRANSMISSION successfully executed the Shifting of Existing Electrical Utilities, including 33kV Lines, 11kV Lines, LT Lines, and Distribution Substations (DSS), along the proposed alignment of NH-5A between Paradeep, Kujanga, and Bhutumundai.

The project was undertaken as part of the Rehabilitation and Upgradation of the Chandikhol–Paradeep Section of NH-5A from 4 Lanes to 8 Lanes, ensuring uninterrupted power supply while facilitating critical highway infrastructure development.

Scope of Work

  • Survey and identification of affected electrical utilities.

  • Dismantling and relocation of existing 33kV, 11kV, and LT power lines.

  • Shifting and reinstallation of Distribution Substations (DSS).

  • Erection of new electrical infrastructure along revised alignments.

  • Testing, commissioning, and restoration of power supply.

  • Compliance with safety, utility, and project specifications.

Project Highlights
✔ Utility shifting for major National Highway expansion project
✔ Relocation of 33kV, 11kV, LT Lines, and DSS infrastructure
✔ Ensured uninterrupted power supply during execution
✔ Timely completion in coordination with highway construction activities
✔ Adherence to quality, safety, and statutory standards

Project Location: Paradeep – Kujanga – Bhutumundai, Odisha

Project Status: Ongoing